Structure Work On Jalan Batu Belig
Location :Batu Belig, Bali
Contract stage 1 : PMN/MLI/002/02/2022
Contract stage 2 : PMN/MLI/003/05/2022
Contract stage 3 : PMN/MLI/005/08/2022
contract swakelola signing 06.01.2022
- FIRST DRAWING
- Land preparation work : Provision of access in and out of project vehicles
- Land preparation work : Provision of access in and out of project vehicles
- Land preparation work : Provision of access in and out of project vehicles
- Land preparation work : Provision of access in and out of project vehicles
- K300 quality concrete casting
- K300 quality concrete casting
- Landfill work
- Uitzet is a field re-measurement activity carried out at the initial stage of a work in a certain field or area, with the aim of ensuring that construction work activities are carried out no more than the land limit should be.
- Uitzet is a field re-measurement activity carried out at the initial stage of a work in a certain field or area, with the aim of ensuring that construction work activities are carried out no more than the land limit should be.
- Uitzet is a field re-measurement activity carried out at the initial stage of a work in a certain field or area, with the aim of ensuring that construction work activities are carried out no more than the land limit should be.
- Uitzet is a field re-measurement activity carried out at the initial stage of a work in a certain field or area, with the aim of ensuring that construction work activities are carried out no more than the land limit should be.
- Site ready for the start of construction work
- Setting out is done by surveyors to determine boredpile foundation points at the dome building
- Bored Pile at the dome building : Foundations for the construction of a building are generally divided into two types, namely shallow foundations and deep foundations. Bored pile is one type of deep foundation which can be used as another alternative if in the implementation of foundation making it is not possible to use a spoon pile foundation.
- Installing a fence along the width of the front so that construction activities are not visible from the road
- Installing a fence along the width of the front so that construction activities are not visible from the road
- Installing a fence along the width of the front so that construction activities are not visible from the road
- Installation of river stone as the basis for installing a 4 meter high wall in the parking area
- Mill test certificate or iron certification from the factory is a document that guarantees product quality in the metal industry and is issued by the manufacturer’s factory. The function of this document is to certify the physical and chemical properties of a material
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- The start of boredpile foundation work on the first four-story building
- The start of boredpile foundation work on the first four-story building
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- The start of boredpile foundation work on the first four-story building
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Installation of sloof reinforcement as a wall foundation as high as 4 meters in the parking area.
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Mill test certificate or iron certification from the factory is a document that guarantees product quality in the metal industry and is issued by the manufacturer’s factory. The function of this document is to certify the physical and chemical properties of a material
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- Setting out by surveyors to determine the bored pile points of a four-story building.
- Setting out by surveyors to determine the bored pile points of a four-story building.
- Started boredpile work on a four-story building
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- Setting out by surveyors to determine the bored pile points of a four-story building.
- The process of completing the installation of a four meter high wall in the parking area.
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Always monitor the availability of materials, the quality of the materials used, and provide quality workforces
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Leveling the parking area
- Leveling the parking area
- Completion of bored pile foundation work on building 1 (four floors) and supporting columns (semi-circle area)
- Parking area compaction work process
- Parking area compaction work process
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Steel fabrication for foundation purposes
- Basement excavation and Piled cap
- Setting out by surveyors to determine the bored pile points of a four-story building 2.
- Started boredpile work on a four-story building 2.
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- The process of completing the installation of a four meter high wall in the parking area.
- Setting out by surveyors to determine the bored pile points of a four-story building 2.
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Setting out by surveyors to determine the bored pile points of a four-story building 2.
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Basement excavation and Piled cap
- Setting out by surveyors to determine the bored pile points of a four-story building 2.
- Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Lean concrete or called LC is a work floor for rigid pavement work. So this layer is not a structural layer. However, it must be present before concrete work (rigid). Its function is only as a work floor so that cement water does not seep into the bottom layer.
- Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- Using the services of a surveyor to determine column placement
- In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 1: Preparation of the first floor sloop casting work
- Building 1: Preparation of the first floor sloop casting work
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 2 : Pile cap is a way to bind the foundation before the column is erected at the top. Pile cap is intended so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Fabrication of column and beam requirements on site
- Fabrication of column and beam requirements on site
- Fabrication of column and beam requirements on site
- Fabrication of column and beam requirements on site
- Fabrication of column and beam requirements on site
- Fabrication of column and beam requirements on site
- Fabrication of column and beam requirements on site
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 2 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 1 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Building 1 :Tie beam is a structural element found in buildings or buildings that use deep foundations or local shallow foundations. This tie beam is located above ground and on local shallow foundations such as footplate foundations or deep foundations
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings before carrying out concrete casting activities on the basement floor
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings before carrying out concrete casting activities on the basement floor
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings before carrying out concrete casting activities on the basement floor
- On May 9, 2022, according to the work schedule, concrete casting was carried out on the basement floor
- To get maximum concrete cast results with K300 quality, we use the services of a mixer company (Riadi Mixer)
- Work team
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch.
- The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch.
- The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch.
- The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch.
- The implementation of casting concrete is carried out after the installation of formwork and reinforcement is complete, in this case the casting is carried out simultaneously so that it will speed up time. Pouring concrete species into concrete slab using pump concentrate and in this implementation we use ready mix concrete with K300
- The implementation of casting concrete is carried out after the installation of formwork and reinforcement is complete, in this case the casting is carried out simultaneously so that it will speed up time. Pouring concrete species into concrete slab using pump concentrate and in this implementation we use ready mix concrete with K300
- Need overtime because the concrete casting work must be completed in one time without a break.
- The ground floor slab concrete casting has been completed with satisfactory results
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- BUILDING 1 : SK SNI T-15-1991-03 defines a column as a structural component of a building whose main task is to support vertical compressive axial loads with an unsupported height of at least three times the smallest lateral dimension. ️
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 1 : In structural engineering, a shear wall is a vertical element of a system that is designed to resist in-plane lateral forces, typically wind and seismic loads
- Building 2 : 1st and Second layer warmesh M10 installation
- Building 2 : 1st and Second layer warmesh M10 installation
- Building 2 : 1st and Second layer warmesh M10 installation
- Building 2 : 1st and Second layer warmesh M10 installation
- Building 2 : 1st and Second layer warmesh M10 installation
- Building 2 : 1st and Second layer warmesh M10 installation
- A control box to accommodate water entering the basement area, which will later be equipped with a pull pump that functions to draw water out automatically at a certain level.
- The way in and out of four-wheeled and two-wheeled vehicles from the basement area to the parking area at the back
- The way in and out of four-wheeled and two-wheeled vehicles from the basement area to the parking area at the back
- The way in and out of four-wheeled and two-wheeled vehicles from the basement area to the parking area at the back
- Dome building: excavation at bore pile points for pile cap placement
- Dome building: excavation at bore pile points for pile cap placement
- Dome building: excavation at bore pile points for pile cap placement
- Dome building: excavation at bore pile points for pile cap placement
- Preparation of concrete casting work stage 2 (K300)
- Preparation of concrete casting work stage 2 (K300)
- Doom Building : Pile cap is used as a foundation to bind the piles that have been installed with the structure above it. The purpose of making a pile cap is so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Doom Building : Pile cap is used as a foundation to bind the piles that have been installed with the structure above it. The purpose of making a pile cap is so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Doom Building : Pile cap is used as a foundation to bind the piles that have been installed with the structure above it. The purpose of making a pile cap is so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Doom Building : Pile cap is used as a foundation to bind the piles that have been installed with the structure above it. The purpose of making a pile cap is so that the location of the column is really at the center of the foundation so that it does not cause eccentricity which can cause additional loads on the foundation.
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- Building 1 and 2: preparation of the second stage of concrete casting
- On May 22, 2022, according to the work schedule, concrete casting was carried out on the basement floor, shearwall, and columns
- To get maximum concrete cast results with K300 quality, we use the services of a mixer company (Riadi Mixer)
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Starting with a shear wall
- Entry and exit to the parking area at the back
- Entry and exit to the parking area at the back
- and floors in building 2
- and floors in building 2
- and floors in building 2
- and floors in building 2
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Next is: The process of ironing the first floor, above the basement
- Prepare the field in the basement to be poured concrete for the next concrete casting schedule
- Prepare the field in the basement to be poured concrete for the next concrete casting schedule
- Prepare the field in the basement to be poured concrete for the next concrete casting schedule
- Prepare the field in the dome building to be poured concrete for the next concrete casting schedule
- It will be the best hi-end club in Batubelig
- It will be the best hi-end club in Batubelig
- Are you ready ?
- On June 12th, 2022, according to the work schedule, concrete casting was carried out on the basement floor, shearwall, and columns
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Starting with a shear wall
- Starting with a shear wall
- Starting with a shear wall
- Casting of K300 concrete on column in Building 2
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Trowel machine, also known as power floats, are tools used during construction to apply a smooth finish to concrete slabs. It is essential to trowel after each concrete pour because this allows the concrete to continue the process of finishing the concrete and squeezing out residual water
- Trowel machine, also known as power floats, are tools used during construction to apply a smooth finish to concrete slabs. It is essential to trowel after each concrete pour because this allows the concrete to continue the process of finishing the concrete and squeezing out residual water
- Trowel machine, also known as power floats, are tools used during construction to apply a smooth finish to concrete slabs. It is essential to trowel after each concrete pour because this allows the concrete to continue the process of finishing the concrete and squeezing out residual water
- Trowel machine, also known as power floats, are tools used during construction to apply a smooth finish to concrete slabs. It is essential to trowel after each concrete pour because this allows the concrete to continue the process of finishing the concrete and squeezing out residual water
- the result of finishing concrete using troweling machine
- the result of finishing concrete using troweling machine
- the result of finishing concrete using troweling machine
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- First floor steel work
- Wiremesh M10 installation, first layer, on the first floor
- Wiremesh M10 installation, first layer, on the first floor
- Wiremesh M10 installation, first layer, on the first floor
- Wiremesh M10 installation, first layer, on the first floor
- First floor steel work progress
- First floor steel work progress
- Wiremesh M10 installation, second layer, on the first floor
- Wiremesh M10 installation, second layer, on the first floor
- Wiremesh M10 installation, second layer, on the first floor
- Wiremesh M10 installation, second layer, on the first floor
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- For the concrete that has been cast in the basement area, which is at least 28 days old, our Site Engineer performs a compressive test of the concrete in the laboratory of the Faculty of Civil Engineering, Udayana University, with the aim of obtaining the results of the compression test from an independent source.
- The results of the compressive test of K 300 quality concrete, carried out on 15 different test objects, were technically proven to produce the desired concrete quality: K300
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Bird Eyes 25.06.2022
- Bird Eyes 25.06.2022
- Bird Eyes 25.06.2022
- Concrete casting activities 29.06.2022
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- To get maximum concrete cast results with K300 quality, we use the services of a mixer company (Riadi Mixer)
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Water proofing coating work on all outer and inner walls of the basement floor, with the aim of preventing moisture on the walls from coming from backfill
- Water proofing coating work on all outer and inner walls of the basement floor, with the aim of preventing moisture on the walls from coming from backfill
- Preparation of floor slabs in dome buildings
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Continuing unfinished steel work on the first floor area, then entering the two-layer wiremest installation stage
- Final check by the structural consultant before the 1st floor slab casting work
- Pipe installation before concrete slab casting work on 1st floor
- Pipe installation before concrete slab casting work on 1st floor
- Pipe installation before concrete slab casting work on 1st floor
- Overtime to ensure the 1st floor area is ready for concrete casting work
- Overtime to ensure the 1st floor area is ready for concrete casting work
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 07.07.2022
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Concrete casting activities 07.07.2022
- Concrete casting activities 07.07.2022
- Concrete casting activities 07.07.2022
- Concrete casting activities 07.07.2022
- Concrete casting activities 07.07.2022
- Concrete casting activities 07.07.2022
- Concrete casting activities 07.07.2022
- Trowel machine, also known as power floats, are tools used during construction to apply a smooth finish to concrete slabs. It is essential to trowel after each concrete pour because this allows the concrete to continue the process of finishing the concrete and squeezing out residual water
- Trowel machine, also known as power floats, are tools used during construction to apply a smooth finish to concrete slabs. It is essential to trowel after each concrete pour because this allows the concrete to continue the process of finishing the concrete and squeezing out residual water
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings
- Steel mile certificate used for the roof frame of the dome building
- Steel mile certificate used for the roof frame of the dome building
- Steel mile certificate used for the roof frame of the dome building
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings
- Using the services of a surveyor to ensure that the column installation points are in accordance with the structural work drawings
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Dome building steel structure fabrication work
- Supervised by Surya (Structural Consultant)
- Supervised by Surya (Structural Consultant)
- Bird Eyes 16.07.2022
- Bird Eyes 16.07.2022
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.202
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Concrete casting activities 17.07.2022
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- Need overtime because the concrete casting work must be completed in one time without a break.
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the concrete cast work, ready mixed quality K300 on the floor slab
- The results of the concrete cast work, ready mixed quality K300 on the floor slab
- The results of the concrete cast work, ready mixed quality K300 on the floor slab
- The results of the concrete cast work, ready mixed quality K300 on the floor slab
- Preparation of concrete casting on several columns on the 1st floor
- Preparation of concrete casting on several columns on the 1st floor
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 23.07.2022
- Concrete casting activities 23.07.2022
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- Formation of floors in the Dome building
- Formation of floors in the Dome building
- 2nd floor iron work
- 2nd floor iron work
- 2nd floor iron work
- Dome Building
- Preparatory work before the concrete casting work begins
- Dome Building
- Dome Building
- Dome Building
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- The results of the compressive test of K 300 quality concrete, carried out on 15 different test objects, were technically proven to produce the desired concrete quality: K300
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 07.08.2022
- Concrete casting activities 07.08.2022
- Concrete casting activities 07.08.2022
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Concrete casting activities 07.08.2022
- Concrete casting activities 07.08.2022
- Concrete casting activities 07.08.2022
- Concrete casting activities 07.08.2022
- Concrete casting activities 07.08.2022
- Progress after casting concrete on the 2nd floor slab in building 2 – 11.08.2022
- Progress after casting concrete on the 2nd floor slab in building 2 – 11.08.2022
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Formwork on columns on the 2nd floor of building 2 and Wiremest installation in two layers (size 10)
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 15.08.2022
- Concrete casting activities 15.08.20
- Concrete casting activities 15.08.20
- Concrete casting activities 15.08.20
- Concrete casting activities 15.08.20
- Concrete casting activities 15.08.20
- Concrete casting activities 15.08.20
- Concrete casting activities 15.08.20
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- The results of the work of K300 quality concrete cast on 45 x 45 columns
- Wiremesh M10 installation, second layer, on the second floor
- Third floor slab work
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 24.08.2022
- Concrete casting activities 24.08.2022
- Concrete casting activities 24.08.2022
- Concrete casting activities 24.08.2022
- Concrete casting activities 24.08.2022
- Concrete casting activities 24.08.2022
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Third floor slab work
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Concrete casting activities 31.08.2022
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 05.09.2022
- Concrete casting activities 05.09.2022
- Concrete casting activities 05.09.2022
- Area preparation for concrete castings, for September 7 and 8, 2022
- Area preparation for concrete castings, for September 7 and 8, 2022
- Area preparation for concrete castings, for September 7 and 8, 2022
- Area preparation for concrete castings, for September 7 and 8, 2022
- Job Mix for cast concrete on 07.09.2022
- Job Mix for cast concrete on 08.09.2022
- Concrete casting activities 07.09.2022
- Concrete casting activities 08.09.2022
- Concrete casting activities 08.09.2022
- Concrete casting activities 08.09.2022
- Concrete casting activities 08.09.2022
- Concrete casting activities 08.09.2022
- Area preparation for concrete castings, for September 14, 2022
- Area preparation for concrete castings, for September 14, 2022
- Area preparation for concrete castings, for September 14, 2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Concrete casting activities 14.09.2022
- Column installation work on 2nd floor, B1
- Column installation work on 2nd floor, B1
- Column installation work on 2nd floor, B1
- Column installation work on 2nd floor, B1
- Column installation work on 2nd floor, B1
- Dome building piledcap preparation work
- Dome building piledcap preparation work
- The results of the compressive test of K 300 quality concrete, carried out on 15 different test objects, were technically proven to produce the desired concrete quality: K300
- Progress 17.09.2022
- Progress 17.09.2022
- Progress 17.09.2022
- Progress 17.09.2022
- Progress 17.09.2022
- Progress 17.09.2022
- Progress 17.09.2022
- Dome building piledcap preparation work
- Dome building piledcap preparation work
- Dome building piledcap preparation work
- Dome building piledcap preparation work
- Column installation work on the 2nd floor B1
- Column installation work on the 2nd floor B1
- Column installation work on the 2nd floor B1
- Area preparation for concrete castings, for September 29, 2022
- Job Mix for cast concrete on 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Concrete casting activities 29.09.2022
- Job Mix for cast concrete on 04.10.2022
- Concrete casting activities 04.10.2022
- Concrete casting activities 04.10.2022
- Concrete casting activities 04.10.2022
- Concrete casting activities 04.10.2022
- Concrete casting activities 04.10.2022
- Update 05.10.2022
- Update 05.10.2022
- Update 05.10.2022
- Update 05.10.2022
- Update 05.10.2022
- Update 05.10.2022
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Preparatory work before the concrete casting work begins
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities 22.10.2022
- The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch.
- The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch.
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 22.10.2022
- Concrete casting activities 23.10.2022
- Concrete casting activities 23.10.2022
- Concrete casting activities 23.10.2022
- Concrete casting activities 23.10.2022
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- The manufacture of concrete cylinders is as a replication of the concrete used for building materials. This concrete cylinder is made from the concrete mix that will be used, which is a sample that will be tested in the laboratory. The number of making concrete cylinders must be presented from the concrete mix of building materials.
- Concrete casting activities 28.10.2022
- Concrete casting activities 28.10.202
- Concrete casting activities 28.10.202
- For the concrete that has been cast in the basement area, which is at least 28 days old, our Site Engineer performs a compressive test of the concrete in the laboratory of the Faculty of Civil Engineering, Udayana University, with the aim of obtaining the results of the compression test from an independent source.
- For the concrete that has been cast in the basement area, which is at least 28 days old, our Site Engineer performs a compressive test of the concrete in the laboratory of the Faculty of Civil Engineering, Udayana University, with the aim of obtaining the results of the compression test from an independent source.
- The results of the compressive test of K 300 quality concrete, carried out on 15 different test objects, were technically proven to produce the desired concrete quality: K300
- Utilization of the quality of K300 concrete can be applied to foundation construction. The building has a function as a complete load-bearing and forces originating from above or outside and transmitted into the hard soil layer. Usually. The location of the foundation is underground.
- Concrete casting activities at 4th floor B219.11.2022
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Concrete casting activities at 4th floor B2
- Always use surveyor services to determine column points.
- Always use surveyor services to determine column points.
- Always use surveyor services to determine column points.
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Dome building structure work
- Casting of K300 slab floor concrete on ground tank 25.11.2022
- Casting of K300 slab floor concrete on ground tank 25.11.2022
- Casting of K300 slab floor concrete on ground tank 25.11.2022
- Casting of K300 slab floor concrete on ground tank 25.11.2022
- Casting of K300 slab floor concrete on ground tank 25.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- Casting of K300 slab floor concrete on Mezzanine 1 of the Dome building 26.11.2022
- The results of the compressive test of K 300 quality concrete, carried out on 15 different test objects, were technically proven to produce the desired concrete quality: K300
- Casting of K300 slab floor concrete on ground tank 26.11.2022
- Casting of K300 slab floor concrete on ground tank 26.11.2022
- Casting of K300 slab floor concrete on ground tank 26.11.2022
- Casting of K300 slab floor concrete on ground tank 26.11.2022
- Casting of K300 slab floor concrete on ground tank 26.11.2022
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Column work 4th floor, B2
- Column work 4th floor, B2
- Column work 4th floor, B2
- Column work 4th floor, B2
- Column work 4th floor, B2
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Always use materials with SNI standards to ensure the quality of the structure
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Preparation of concrete cast on the 4th floor column, B2
- Concrete casting of K300
- K300 concrete casting work on columns on the 4th floor, B2 – 01.12.2022
- K300 concrete casting work on columns on the 4th floor, B2 – 01.12.22
- K300 concrete casting work on columns on the 4th floor, B2 – 01.12.22
- K300 concrete casting work on columns on the 4th floor, B2 – 01.12.22
- K300 concrete casting work on columns on the 4th floor, B2 – 01.12.22
- K300 concrete casting work on columns on the 4th floor, B2 – 01.12.22
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of steel roof structure installation on dome buildings
- Preparation of steel roof structure installation on dome buildings
- Preparation of steel roof structure installation on dome buildings
- Preparation of steel roof structure installation on dome buildings
- Preparation of steel roof structure installation on dome buildings
- Preparation of steel roof structure installation on dome buildings
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Steel roof structure installation work on dome building started 09.12.2022
- Steel roof structure installation work on dome building started 09.12.2022
- Steel roof structure installation work on dome building started 09.12.2022
- Steel roof structure installation work on dome building started 09.12.2022
- Mix Design K300 concrete casting work on ground tank 09.12.2022
- K300 concrete casting work on ground tank 09.12.2022
- K300 concrete casting work on ground tank 09.12.2022
- K300 concrete casting work on ground tank 09.12.2022
- K300 concrete casting work on ground tank 09.12.2022
- K300 concrete casting work on ground tank 09.12.2022
- K300 concrete casting work on ground tank 09.12.2022
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Preparation of cast concrete floor slab 4th floor B1
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- defaultMix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Mix Design K300 concrete casting work on ground tank 11.12.2022
- Stage of completion of the 4th floor structure
- The preparatory stage for the installation of the steel roof structure of the dome building
- The preparatory stage for the installation of the steel roof structure of the dome building
- The preparatory stage for the installation of the steel roof structure of the dome building
- The preparatory stage for the installation of the steel roof structure of the dome building
- Preparation of the 4th floor column casting work
- Steel roof structure installation work begins
- Steel roof structure installation work begins
- Steel roof structure installation work begins
- Steel roof structure installation work begins
- Steel roof structure installation work begins
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Concrete column casting activities on the 4th floor, building 1. 20.12.2022
- Steel roof structure installation work begins
- Steel roof structure installation work begins
- Dome building steel roof installation in progress
- Dome building steel roof installation in progress
- Dome building steel roof installation in progress
- Dome building steel roof installation in progress 23.01.2023
- Dome building steel roof installation in progress 23.01.2023
- Dome building steel roof installation in progress 23.01.2023
- Second floor mezzanine slab work
- Second floor mezzanine slab work
- Second floor mezzanine slab work
- Partition wall work on dome buildings
- Partition wall work
- Partition wall work
- Partition wall work
- Partition wall work
- Partition wall work
- 5th floor steel work
- 5th floor steel work
- 5th floor steel work
- Progress 04.03.2023
- Progress 04.03.2023
- Cast concrete mezzanine floor #2
- Cast concrete mezzanine floor #2
- Cast concrete mezzanine floor #2
- 5th floor concrete casting (Roof top)
- 5th floor concrete casting (Roof top)
- 5th floor concrete casting (Roof top)
- 5th floor concrete casting (Roof top)
- 5th floor concrete casting (Roof top)
- Progress 30.03.2023
- Progress 30.03.2023
- Progress 30.03.2023
- Progress 30.03.2023